Buy BS EN TESTING FRESH CONCRETE – PART 1: SAMPLING from SAI Global. said in BS EN , take a few samples throughout the pour for the best representation of the batch and make sure you take % of what you think you’ll . This British Standard specifies two procedures for sampling fresh concrete which are implemented by composite sampling and by spot.

Author: Galrajas Samuramar
Country: Indonesia
Language: English (Spanish)
Genre: Software
Published (Last): 16 July 2018
Pages: 65
PDF File Size: 18.14 Mb
ePub File Size: 7.96 Mb
ISBN: 126-7-95289-947-3
Downloads: 22807
Price: Free* [*Free Regsitration Required]
Uploader: Tushakar

Concrete cubes at the site Marking The test specimens shall be marked clearly and indelibly, without damaging the specimen using a cub tag that contains the information related to the specimen Casting date, ticket number, ba ID, location of sampling….

These limits are sufficient for normal UK temperatures. Subscription pricing is determined by: The Red document status indicator indicates that the document is an old version The document has likely been withdrawn by the publisher, also the meta data presented here may be out of date as it is no longer being maintained by the editorial teams at NBS.

Thank you for another wonderful post. BS EN specifies two procedures for sampling fresh concrete, by composite sampling and by spot sampling. The report shall include: This document Older versions.

You are commenting using your Twitter account. Already Subscribed to this document.

BS EN – Testing fresh concrete. Sampling – BSI British Standards

Concrete having coarse 21350-1 up to 40 mm in size. Please first log in with a verified email before subscribing to alerts. You are commenting using your WordPress. The mold is raised and the concrete allowed to subside.

It may be used to verify conformance to a specified requirement for the temperature of concrete. Apparatus Container, eh enough to provide at least 75 mm of concrete in all directions around the sensor of the temperature measuring device, or at least three times the NMAS Nominal Maximum Aggregate Sizewhichever is greater. After compaction of each layer, tap the sides of the container smartly with the mallet until large bubbles of air cease to appear on the surface and depressions left by the compacting rod or bar, are removed.

  INSTRUCCIONES MONTAJE CUNA STOKKE PDF

Mechanical vibration with vibrating table Apply the vibration for the minimum duration necessary to achieve full compaction of the concrete.

Again there may be more recent versions of the document. Clean all the apparatus prior to use. This site uses cookies.

Move the scoop around the perimeter of the mold to ensure even distribution of material and minimize segregation. You may delete a document from your Alert Profile at any time. Please first verify your email before subscribing to alerts.

Record the date and time of sampling. Fill in your details below or click an icon to log in: Fill the mold in three layers of approximately equal height. Rod each layer 25 times using the rounded end of the tamping rod. Surface leveling Remove the excess concrete above the upper edge of the mould using the steel trowel or float and carefully level the surface. Complete the temperature measurement within 5 min except for concrete containing the coarse aggregate of a nominal maximum size greater than 75 mm which may require up to 20 min for the transfer of heat from the aggregate to the mortar.

This standard is also available to be included in Standards Subscriptions.

BS EN 12350-1/BS EN 12350-2/BS EN 12390-2/BS EN 12390-2

Proceed to Checkout Continue Shopping. The time for this to occur depends on the concrete temperature, cement type, mix proportions, the use of admixtures with set retarding properties and consistency of the concrete.

  JRC 2902 PDF

This European Standard specifies two procedures for sampling fresh concrete, by composite sampling and by spot ba. Avoid over-vibration, which may cause loss of entrained air. Quantity at least 1. By continuing to use this website, you agree to their use. I have a presentation subsequent week, and I am on the look for such info.

BS EN – Testing fresh concrete. Sampling (British Standard)

See more standards on testing concrete. Pressure e BS EN Take the scoopfuls of concrete through the moving stream from truck mixer. What is the time limit before placing of fresh concrete? Your Alert Profile lists the documents that will be monitored. Gently press the concrete around the TMD at the surface of concrete so that the ambient temperature does not influence the reading.

Notify me of new comments via email.

Sampling BS EN specifies two procedures for sampling fresh concrete, by composite sampling and by spot sampling. The first school of thought is rather straightforward: Standards Subscriptions from ANSI provides a money-saving, multi-user solution for accessing standards.

BS EN 12350-1:2009

Scoopfuls are taken from four different parts of the load to form the standard sample. Now, if the placement of concrete goes beyond these waived time limit, the concrete should be rejected. Report from the sample includes: What is the frequency of Sampling of Concrete? Leave a Reply Cancel reply Enter your comment here After this, the design mix specific to the particular type of structure recommends the discharge time limit waived against what is stated in the specifications.